Profile drawing of Z3 Max Schulz
119,0 mOverall length
3156 tMaximum displacement
36,0 knMaximum speed
325Complement

Design and service

The story of Z3 Max Schulz

Z3 Max Schulz was operating in the Baltic Sea near Danzig at the outbreak of the war, later transferred to the North sea after the Polnish campaign. The ship took part on two mining operations in British coastal waters. During a mining mission on 22.02.1940 (Operation Wikinger), Max Schulz was attacked by a German Heinkel He 111 bomber at the Doggerbank. Run into a minefield while evading the bombs.

Sunk after bomb and mine hits.

Operational history

Service timeline

Raid to intercept Britain - Scandinavia trade together with battleship Gneisenau, CL Köln and destroyers Wilhelm Heidkamp, Erich Steinbrinck, Diether von Roeder, Theodor Riedel, Paul Jakobi, Bernd von Arnim, Friedrich Ihn and Friedrich Eckoldt. No results.

Mine laying operations together with the destroyers Friedrich Eckold and Richard Beitzen against the Shipwash-Area. The mine laying destroyers are supported by Wilhelm Heidkamp, Theodor Riedel and Hermann Schoemann.

Operation "Wikinger": Together with Richard Beitzen, Erich Koellner, Theodor Riedel, Friedrich Eckold and Leberecht Maas, the Max Schulz operate against british fishing boats at the Doggerbank. On their way to the operations area, the destroyers are attacked by a German bomber, sinking the Leberecht Maas. During the evasive maneuvers, the destroyers run into British mines and the Max Schulz is lost after a mine hit.

At a glance

Technical profile

Dimensions, armament, protection and performance.

Dimensions

Size (Max)
3156 t
Length (Total)
119,0 m
Length (Waterline)
114,0 m
Beam
11,3 m
Draft
4,23 m
Crew
325

Armament

12,7 cm L/45 C/34
5
3,7 cm L/83 C/30
4
2 cm MG L/65 C/30
4-6
53,3 cm Torpedo tubes
8
Mines
60

Machinery

Shafts
2
Turbines
2
Type
Wagner Geared Turbines

Performance

Total Performance
70000 shp
Speed
36,0 kn
Range
1900 sm at 19 kn

The archive

Models

Ship models in 1/1250 scale.

Neptun 1065 Z1 - Z4 1939
Neptun 1065 Z1 - Z4 1939

Construction record

Z3 Max Schulz

Laid down
Deutsche Werke Kiel, 02.01.1935
Launched
30.11.1935
Commissioned
08.04.1937
Fate
sunk after bomb and mine hits on 22.02.1940
Cost
13,7 Mio Reichsmark