Profile drawing of Z12 Erich Giese
121,0 mOverall length
3190 tMaximum displacement
37,0 knMaximum speed
325Complement

Design and service

The story of Z12 Erich Giese

Z12 Erich Giese took part in one mining operation in British coastal waters on 07.12.1939 where it torpedoed the British destroyer Jersey, damaging the ship heavily.

During in Operation Weserübung the Z12 Erich Giese was part of the Kriegsschiffgruppe 1 heading for Narvik, where it was sunk on 13.04.1940 after a battle with 6 British destroyers.

Operational history

Service timeline

Together with Theodor Riedel and the mine layers Cobra and Roland, the Erich Giese lays the anti submarine mine field "f" MARTHA-HANS in the North Sea. 666 Mines are laid during this operation, 100 from Erich Giese.

Together with Theodor Riedel and the mine layers Cobra and Roland, the Erich Giese lays the mine field "a" MARTHA-IDA in the North Sea. 666 Mines are laid during this operation, 100 from Erich Giese.

Mine laying operation with Bernd von Arnim and Hans Lody against Cromer. During the operation, the German destroyers attack the British destroyers Juno and Jersey, damaging the Jersey with a torpedo fired from Erich Giese.

Operation Weserübung: Erich Giese joins the destroyers Georg Thiele, Wolfgang Zenker, Anton Schmitt, Bernd von Arnim, Erich Koellner, Diether von Roeder, Hans Lüdemann, Hermann Künne and Wilhelm Heidkamp in the Narvik Attack Group.

Operation Weserübung: The destroyer is sunk by the British destroyers Cossack and Foxhound west of Narvik.

At a glance

Technical profile

Dimensions, armament, protection and performance.

Dimensions

Size (Max)
3190 t
Length (Total)
121,0 m
Length (Waterline)
116,0 m
Beam
11,3 m
Draft
4,23 m
Crew
325

Armament

12,7 cm L/45 C/36
5
3,7 cm L/83 C/30
4
2 cm MG L/65 C/30
6
53,3 cm Torpedo tubes
8
Mines
60

Machinery

Shafts
2
Turbines
2
Type
Wagner Geared Turbines

Performance

Total Performance
70000 shp
Speed
37,0 kn
Range
2680 sm at 19 kn

Construction record

Z12 Erich Giese

Laid down
Germaniawerft Kiel, 03.05.1935
Launched
12.03.1937
Commissioned
04.03.1939
Fate
sunk 13.04.1940
Cost
13,4 Mio Reichsmark