Profile drawing of Z 13 Erich Koellner
121,0 mOverall length
3190 tMaximum displacement
37,0 knMaximum speed
325Complement

Design and service

The story of Z 13 Erich Koellner

Z 13 Erich Koellner took part in two mining operations in British coastal waters in 1939 and 1940. During in Operation Weserübung the Z 13 Erich Koellner was part of the Kriegsschiffgruppe 1 heading for Narvik. It was sunk on 13.04.1940 in the Ofotfjord near Narvik after a battle with 6 British destroyers. Wreck raised and broken down in 1963.

Operational history

Service timeline

Mine laying operations together with the destroyers Richard Heinemann and Wilhelm Zenker against Cromer.

Mine laying operations together with the destroyers Wolfgang Zenker and Brono Heinemann against the Haisborough lightship. The mine laying destroyers are supported by Wilhelm Heidkamp, Theodor Riedel and Hermann Schoemann.

Operation "Wikinger": Together with Richard Beitzen, Friedrich Eckold, Theodor Riedel, Max Schulz and Leberecht Maas, the Erich Koellner operates against british fishing boats at the Doggerbank. On their way to the operations area, the destroyers are attacked by a German bomber, sinking the Leberecht Maas. During the evasive maneuvers, the destroyers run into British mines and the Max Schulz is lost after a mine hit.

Operation Weserübung: Erch Koellner joins the destroyers Georg Thiele, Wolfgang Zenker, Anton Schmitt, Erich Giese, Bernd von Arnim, Diether von Roeder, Hermann Lüdemann, Hermann Künne and Wilhelm Heidkamp in the Narvik Attack Group.

Operation Weserübung: The destroyer is sunk by the British destroyers Bedouin, Eskimo, Icarus and Funjabi at the Ofotfjord.

At a glance

Technical profile

Dimensions, armament, protection and performance.

Dimensions

Size (Max)
3190 t
Length (Total)
121,0 m
Length (Waterline)
116,0 m
Beam
11,3 m
Draft
4,23 m
Crew
325

Armament

12,7 cm L/45 C/36
5
3,7 cm L/83 C/30
4
2 cm MG L/65 C/30
6
53,3 cm Torpedo tubes
8
Mines
60

Machinery

Shafts
2
Turbines
2
Type
Wagner Geared Turbines

Performance

Total Performance
70000 shp
Speed
37,0 kn
Range
2680 sm at 19 kn

Construction record

Z 13 Erich Koellner

Laid down
Germaniawerft Kiel, 12.10.1935
Launched
18.03.1937
Commissioned
28.03.1939
Fate
sunk 13.04.1940
Cost
13,4 Mio Reichsmark