Profile drawing of Z22 Anton Schmitt
125,10 mOverall length
3469tMaximum displacement
40,45 knMaximum speed
323Complement

Design and service

The story of Z22 Anton Schmitt

Until February 1940 the ship took part in one offensive mine laying operation in the North Sea. During in Operation Weserübung, Z22 Anton Schmitt was part of the Kriegsschiffgruppe 1 heading for Narvik and sunk by two torpedoes shoot from British destroyers on 10. 04.

1940 while anchoring in Narvik harbor.

Operational history

Service timeline

Mine laying operations together with the destroyers Wilhelm Heidkamp, Karl Galster, Richard Beitzen, Friedrich Ihn and Friedrich Eckold against Newcastle.

Operation Weserübung: Anton Schmitt joins the destroyers Georg Thiele, Wolfgang Zenker, Bernd von Arnim, Erich Giese, Erich Koellner, Diether von Roeder, Hans Lüdemann, Hermann Künne and Wilhelm Heidkamp in the Narvik Attack Group.

Operation Weserübung: The destroyer is sunk by British destroyers at Narvik by artillery and torpedo hits.

At a glance

Technical profile

Dimensions, armament, protection and performance.

Dimensions

Size (Max)
3469t
Length (Total)
125,10 m
Length (Waterline)
120,60 m
Beam
11,75 m
Draft
4,50 m
Crew
323

Armament

12,7 cm L/45 C/34 (5")
5
3,7 cm L/83 C/30
4
2 cm MG L/65 C/30
4
53,3 cm Torpedo tubes
8
Mines
60
Depth Charge launcher
4

Machinery

Shafts
2
Turbines
2
Type
Wagner (Deschimag build)

Performance

Total Performance
74482
Speed
40,45 kn
Range
2050 miles at 19 kn

Construction record

Z22 Anton Schmitt

Laid down
Deschimag Bremen, 03.01.1938
Launched
20.09.1938
Commissioned
24.09.1939
Fate
sunk on 10.04.1940
Cost
12,87 Mio Reichsmark