Profile drawing of Z24
127,0 mOverall length
3605 tMaximum displacement
37,5 knMaximum speed
320 - 332Complement

Design and service

The story of Z24

Z24 was part of the 8th destroyer flotilla - also called the "Narvik" flotilla. Between June and October 1941 attached to the 6th destroyer flotilla in France then stationed in Kirkens and used for unsuccessful operations along the Murman coast until the end of 1941 when returned to Germany. After a short visit in Germany from January to March of 1942, the Z24 was part of the "Zerstörergruppe Arktis" and operated against the convoy PQ 13.

In April 1942, Z24, Z25 and Hermann Schoemann attacked the damaged British cruiser Edinburgh, damaging the British ship that it had to be sunk. Until Mid of 1942 the ship was based in Narvik and was transferred to France in March 1943 where it was sunk on 25. 08.

1944 after air attacks by British Beaufighters near Le Verdon at 45°31'N,14°12'E.

Operational history

Service timeline

Transfer of Z23 and Z24 to Bergen.

Z23 and Z24 escort the heavy cruiser Admiral Hipper on its way back from the North Atlantik to Germany from Bergan to the Skagerak.

The destroyers Z23 and Z24 and the torpedo boat Iltis escort the heavy cruiser Admiral Scheer on its way back from the North Atlantik to Germany from Norway to Germany.

Hans Lody, Friedrich Eckold, Karl Galster, Z23 and Z24 escort the damaged cruiser Lützow (airborne torpedo hit) back to Germany.

Destroyers Z23 and Z24 are transferred to Brest.

The 5th destroyer flotilla of Erich Steinbrinck, Friedrich Ihn, Bruno Heinemann, Z23 and Z24 is sent from La Pallice to Brest. On their way back, they escort the battleship Scharnhorst on its way to La Pallice.

The 5th destroyer flotilla consisting of Erich Steinbrinck, Friedrich Ihn, Bruno Heinemann, Z23 and Z24 escort the bomb damaged battleship Scharnhorst from La Pallice to Brest.

Erich Steinbrinck, Bruno Heinemann, Z23 and Z24 meet the auxiliary cruiser Orion in the Biskay and escort it to France.

Z23 and Z24 are sent back to Germany.

Z24 and Z26 are transferred to North-Norway.

Operations of Z23, Z24, Z25 and Z27 against the Kola coast. After a battle against the British MTB Hazard and Speedy (hit 4 times), the destroyers return to their base.

The 8.Z-Flotilla, constiting of Z23, Z24, Z25 and Z27 sails out of the Ofotfjord.

Z23, Z24, Z25 and Z27 operate at the Lofoten.

Z23, Z24, Z25 and Z27 escort the Adolf Lüderitz from Tromsö to Kirkenes.

Mine operation of Z23, Z24 and Z25 at Cape Kacovskij in the White Sea.

The transfer of Z23, Z24 and Z25 from Kirkenes to Tromsö is canceled after Z23 and Z24 were damaged after running aground.

Z23, Z24 and Z25 are sent from Kirkenses to Tromsö.

Z24 and Z25 return to Germany.

The destroyers Z24, Z26, Z30 and the torpedo boats T11, T15 and T16 escort the heavy cruiser Admiral Hipper to Trondheim.

Z24, Z25 and Z26 are relocated to Kirkenes.

Operation of Z24, Z25 and Z26 against the convoy PQ13: After the loss of Z26 and rescue of its crew, the remaining destroyers have a short battle with the British destroyer Oribi and the Soviet destroyers Sokrusitelnyj and Gremjascyj.

Unsuccessfull attempt of Hermann Schoemman, Z24 and Z25 to attack the convoy PQ14.

Z24 and Z25 escort the tender Tanga from Kirkenes to Narvik.

Operation Rösselsprung: In a major operation of the battleship Tirpitz and the heavy cruisers Admiral Scheer, Lützow and Admiral Hipper against the allied convoy PQ17, several destroyers and torpedo boats escort the capital ships: Friedrich Ihn, Hans Lody, Karl Galster, Theodor Riedel, Richard Beitzen, Friedrich Eckoldt, Erich Steinbrinck, Z24, Z27, Z28, Z29, Z30, T7 and T15. The operation is cancelled, but the convoy is heavily attacked by U-boats and the Luftwaffe.

Covered by the destroyers Friedrich Ihn and Z24 and the torpedo boats T7 and T15 the heavy cruiser Lützow transfers to Trondheim.

Mine laying operation in the North Sea by light cruiser Köln and destroyers Friedrich Ihn, Friedrich Eckoldt and Z24.

Friedrich Ihn and Z24 return to Germany.

At a glance

Technical profile

Dimensions, armament, protection and performance.

Dimensions

Size (Max)
3605 t
Length (Total)
127,0 m
Length (Waterline)
121,9 m
Beam
12,0 m
Draft
4,65 m
Crew
320 - 332

Armament

15 cm L/48 C/36 (5,9")
4 (5 since 1942)
3,7 cm L/83 C/30
4
2 cm MG L/65 C/30
5 (12 since 1942)
53,3 cm Torpedo tubes
8
Mines
60
Depth Charge launcher
4

Machinery

Shafts
2
Turbines
2
Type
Wagner (Deschimag build)

Performance

Total Performance
70000 shp
Speed
37,5 kn
Range
2174 miles at 19 kn

Construction record

Z24

Laid down
Deschimag Bremen, 02.01.1939
Launched
07.03.1940
Commissioned
26.10.1940
Fate
sunk 25.08.1944
Cost
13,18 Mio Reichsmark